您现在的位置是:重庆速绘工程技术服务有限公司 > 产品中心

重庆某跨江大桥快速三维扫描测绘与BIM建模项目

重庆速绘工程技术服务有限公司26-05-16【产品中心】9人已围观

简介基于综合项目交付的进度管理优化设计研究

基于综合项目交付的进度管理优化设计研究

很赞哦!(73347)

上一篇: .Taking a road project as an example, expounds the application of three-dimensional laser scanning technology and BIM Technology in road construction quality inspection. With the help of three-dimensional laser scanning technology, the three-dimensional coordinate data of the measured object surface can be captured very efficiently. After processing the data, the road point cloud model which can reflect the real situation can be obtained. With the help of the parametric modeling function of BIM technology, the road design BIM model which can reflect the design intention can be obtained quickly. By comparing the point cloud model with the design BIM model, the data deviation between the current road and the design can be obtained. This method has the advantages of strong operability, wide inspection range, high measurement accuracy and reliable analysis results, which can reduce the labor cost and shorten the construction period. It is a new type of construction quality inspection method.

下一篇: .现如今,建筑业工程项目不断的向工作流程全球化发展,不断下降的施工效率正在削弱可靠而高利润地实施建筑项目的能力。对于业主和承包商而言,项目的施工进度控制目标直接关系到二者的重大利益,是工程施工承包合同能否顺利进行的关键。随着前期多方合作的不断发展和建筑信息模型(Building Information Model,BIM)技术的成熟,一种能够完整并合理利用全过程多方合作和BIM技术的交付方式是时代发展的必然。而综合项目交付IPD运用其独有的三方合同结合建筑信息模型BIM技术有效地促进了项目管理模式的发展,对进度管理具有良好的发展前景和推广意义。在此背景之下,本文对IPD进行深入研究,综合考虑采购-设计-成本-施工因素,进行基于IPD的协同进度管理优化设计研究,对促进现阶段IPD应用于进度控制进而促进生产具有建设性意义。 首先,本文详细介绍了综合项目交付原则及其实质。为了进一步利用IPD,本文将IPD模式与传统项目交付方式进行了深入对比分析。其次,在本文对影响工程进度的主要因素进行深入探讨的基础之上,利用IPD有针对性地设计进度控制管理方法。再次,为了实现综合项目交付的协同进度管理,本文对协同理论进行了相关研究,然后根据协同管理所要求的要素结合影响进度的主要因素进行专门的协同进度优化设计。最后,本文为了验证该协同进度优化设计,深入嘉绍跨江大桥现场进行调研分析,并提出了解决方案。BIM技术在刚性加劲悬索连续钢桁架桥设计施工中的应用研究